Mid-Station Lodge at Whiteface Mountain

Every aspect of this new building was designed to withstand the harsh mountainside climate
Malone DPW Facility

Department of Public Works Facility Feasibility Study, Design & Construction
Chilson Water Tank

Chilson Water Tank
Town of Crown Point Main Street Infrastructure Reconstruction

Town of Crown Point
Main Street Infrastructure Reconstruction
Town of Newcomb Well Field Control Building

The project included the construction of a well field control building, associated utilities, the installation
Beekmantown Salt Storage Facility

Design of a salt storage facility, housing 12,000cy of salt/sand mix.
St. Regis Mohawk Tribe Cook Farm Road Design

AES provided comprehensive engineering services, from design to construction.
Village of Saranac Lake Dorsey Street Sanitary Sewer Reconstruction

Installation of replacement sewer pipe and manholes
Saranac Replacement Culverts

After a severe storm damaged existing culverts, AES worked with the Town, using FEMA aid to design a better system.