Making Sense of Preliminary Engineering Reports

Preliminary Engineering Reports are a necessary step for most projects. Learn more about what they entail.
How Covid has Changed the Parameters for Workplace Design

Covid-19 changed many aspects of daily life, including how and where we work. What factors may find their way into the design of new workplaces?
Partner, Wayne Ryan, PE, Retires from AES

Above: The Town of Essex Wastewater Treatment Plant earned AES a design award from the Adirondack Park Agency. Wayne Ryan, PE, recognizes the project as a notable accomplishment during his tenure at the firm. With deep gratitude and appreciation, we announce the retirement of Partner and Co-Founder, Wayne Ryan, PE. While Wayne’s presence at the […]
10 Tips for the Fundamentals of Engineering Exam

How to prepare for the Fundamentals of Engineering Exam
Essex Sewer District

Award winning design and construction of a wasterwater treatment facility.
Wadhams Water District

Water system upgrade, including Green Project Funding to cover the installation of photovoltaic panels.
Solar Construction Management Oversite

Construction management oversite for a large scale solar installation.
Whiteface Lodge

Design of a luxury resort in the heart of the Adirondacks.
Higher Ground

Renovation of a popular night club and music venue.
Vermont Student Assistance Corporation

Design of a public resource center, both welcoming and inspiring to students and their families.
South Burlington Police Station

Renovation of an existing office building into a dynamic new facility.
Jay Peak Resort: Austria Haus Renovation

Redesign of administrative offices into a space for resort guests.
Jay Peak Resort: Sky Haus Renovation

Renovation of Jay Peak’s historic Sky Haus.
Jay Peak Resort: Guest Lodging

Guest lodging designed to Energy Star standards.
VINS Nature Center

Campus plan, administration and aviary program buildings, designed with sustainability in mind.
Champlain College: Miller Center

An industrial-style building with flexible spaces for college educational programs and administration.
Champlain Valley Exposition

Grand entry and ticketing building for the Champlain Valley Expo.
McClure Miller VNA Respite House

A comforting and peaceful environment.
Jay Peak Tram Haus Lodge

New boutique resort and ski lodge.
Grand Isle Residence

Renovations and additions to make the most of a spectacular lake view.
Burke Mountain Lodge

A large hotel and conference center, with main function as a ski lodge.
Sun & Ski Inn / Stowebowl

A swanky boutique bowling alley in Stowe, VT.
Lake Champlain Regional Technical Academy

A new technology center.
Champlain College: Freeman Hall

Design of the President’s Office suite at Champlain College.
Jericho Market

Interior and exterior design of a busy general store.
PedsOne

Architecture and interior design of medical administrative office.
Elizabethtown-Lewis Central School Domestic Hot Water Improvements

Design of replacement hot water system for the Elizabethtown-Lewis Central School.
AuSable Forks Fire Station Renovation

Renovations and efficiencies for the AuSable Forks Fire District Fire Station.
Cooling System Replacement

Design of a replacement cooling system for a large academic building.
Emergency Generator

Design of a critical operations power system for the Essex County Emergency Services Public Safety Building.
Beekmantown Salt Storage Facility

Design of a salt storage facility, housing 12,000cy of salt/sand mix.
St. Regis Mohawk Tribe Cook Farm Road Design

AES provided comprehensive engineering services, from design to construction.
St. Armand Wastewater Treatment Plant and Pump Station

Upgrades and modifications to an existing municipal sewer treatment system, including energy efficiencies.
Village of Saranac Lake Dorsey Street Sanitary Sewer Reconstruction

Installation of replacement sewer pipe and manholes
Community Redevelopment Strategy and Implementation Plan

This GIS and mapping project served as the base for the community’s redevelopment plan.
Willsboro Point Subdivision

Complex survey project of a property subdivision.
Kinney Drugs with Drive-Thru Pharmacy

Commercial mapping project on a site with complex zoning issues.
Former Clinton County Airport Adaptive Reuse Plan

Large scale mapping project for the land use planning of a former airport into a business park.
City of Plattsburgh Marina Building

A complete redesign and renovation from casual restaurant into a City Marina.
St. Mary’s School Restoration

St. Mary’s school was damaged by fire in September of 2014. AES’s architecture and engineering teams worked efficiently through the restoration.
Jennifer Weeks, PE

Associate/ Environmental Engineer
Shannon Vogt

Engineering Technician II & Construction Manager I
Max Villanueva

GIS Specialist
Taylor Trombley

Intern Engineer
Quinn Rufa

PE
Evan Reil, LS

Associate/Land Surveyor
Glen Porter

Resident Project Representative
John Olsen

Resident Project Representative
Ryan Oliver

Project Administrator
Bradley Noviski

Senior Associate/Program/Project Manager